The safest & most advanced power distribution system
on the Australian Market

Call Now For Power Safety

1800 338 979

PSLST1 LEAD STAND

61

PSLST1 LEAD STAND

Leads should be on hangers or stands to provide a safe route through the work area and passageways and to provide sufficient height clearance for personnel and vehicles. Clearance of at least 2 metres should be maintained in work areas where personnel work ‘Extracted from Electrical Practices for Construction Work – Contractors Checklist, WorkCover NSW (Section 4)

Get a Quote

 
 
 

Product Information

  • Adjustable height from 1.1 to 2.4 metres
  • Adjustable tripod base for stability on uneven ground
  • Safety Yellow
  • Tripod base is easily disassembled for storage and transport
  • Hooks are non-conductive and can hold a minimum of 5 leads
  • Plastic coated contact points for leads eliminating abrasions and cuts to leads
  • Comes complete with sandbag for additional stability